Pricing trends for Low-Code Platforms: 3 tracked pricing changes across 15 vendors. Direction: prices rising.

Low-Code Platforms Pricing Trends

Pricing direction: ↑ Prices rising

15
Vendors
1%
of All Tracked Changes
2
At-Risk Vendors
restructured 1 model change 1 increased 1

Pricing Change Timeline

Every record we hold is listed here, newest first. A record is never removed from this list, so a vendor named here stays named here whatever its verdict does afterwards.

restructured Mendix discovered 2026-09-21 · effective date unknown high
The Free tier still exists. Specifically, Project Dashboard, IDP Integration, Vertical Scalability, Horizontal Scalability, HA/Fallback, Multi-region failover, and Uptime Guarantee are no longer available in the Free tier. Source ↗
model change ToolJet discovered 2026-09-13 · effective date unknown high
A free tier is mentioned with "$0 per builder to start, with no credit card and no trial clock", the page details a much broader set of features and capabilities beyond the simple description of an extensible low-code framework. Source ↗
increased Retool discovered 2026-08-28 · effective date unknown medium
The free tier also includes up to 20 hours/month of Agents and 250 AI credits/month. Source ↗

At-Risk Vendors

All 2 of the 15 vendors we list in this category that carry one. A vendor is named here for as long as a demotion is in force against it: a one-off pricing event, recorded against a source we cite, whose date falls in the last 180 days — or a standing condition, also cited, such as a free tier withdrawn or a product retired, which does not expire with time. A demotion can lift with nothing about the vendor having changed, and that happens on the day the vendor's newest qualifying event passes 180 days.

Stable Picks

All 5 of the 15 vendors we list in this category that qualify, not a selection of them. A vendor is named here for as long as no demotion is in force against it and we hold no change record for it dated in the last 90 days — any record, including ones the timeline above does not count. A vendor can join this section on a day we recorded nothing about it, when the later of those two clocks runs out: 90 days after its newest record, or the day the demotion against it lapses. It leaves on the day we file a new record, or the day we can no longer vouch for the terms we list.

Related